Physical and Environmental Protection (PE)
The Physical and Environmental Protection family has 22 active controls in SP 800-53 release 5.2.0. “Yes” marks membership in the SP 800-53B baselines.
| Control | Title | Low | Moderate | High | Privacy |
|---|---|---|---|---|---|
| PE-1 | Policy and Procedures | Yes | Yes | Yes | |
| PE-2 | Physical Access Authorizations | Yes | Yes | Yes | |
| PE-3 | Physical Access Control | Yes | Yes | Yes | |
| PE-4 | Access Control for Transmission | Yes | Yes | ||
| PE-5 | Access Control for Output Devices | Yes | Yes | ||
| PE-6 | Monitoring Physical Access | Yes | Yes | Yes | |
| PE-8 | Visitor Access Records | Yes | Yes | Yes | |
| PE-9 | Power Equipment and Cabling | Yes | Yes | ||
| PE-10 | Emergency Shutoff | Yes | Yes | ||
| PE-11 | Emergency Power | Yes | Yes | ||
| PE-12 | Emergency Lighting | Yes | Yes | Yes | |
| PE-13 | Fire Protection | Yes | Yes | Yes | |
| PE-14 | Environmental Controls | Yes | Yes | Yes | |
| PE-15 | Water Damage Protection | Yes | Yes | Yes | |
| PE-16 | Delivery and Removal | Yes | Yes | Yes | |
| PE-17 | Alternate Work Site | Yes | Yes | ||
| PE-18 | Location of System Components | Yes | |||
| PE-19 | Information Leakage | ||||
| PE-20 | Asset Monitoring and Tracking | ||||
| PE-21 | Electromagnetic Pulse Protection | ||||
| PE-22 | Component Marking | ||||
| PE-23 | Facility Location |
Withdrawn controls: PE-7.
Independent guidance, not an official NIST publication. Control text is from NIST SP 800-53 Rev. 5 and SP 800-53A (public domain). Original content is licensed CC BY 4.0; program templates and the downloadable kit are dedicated to the public domain under CC0 1.0.