Supply Chain Risk Management Plan
Supply Chain Risk Management Plan template: A system's cybersecurity supply chain risk management plan, following the sample outline in NIST SP 800-161 Rev. 1 Appendix D.3.1 and the outline example NIST publishes with SP 800-18 Rev. 2, with the system's critical components, services and suppliers, the supply chain controls selected, the risks accepted, and the plan's approval, review and protection, as SP 800-53 SR-2 requires.
| Type | Program stage | Status | Template version | NIST basis |
|---|---|---|---|---|
| Plan | Mature | Draft | 1.0.0 | SP 800-53 release 5.2.0 |
What it is
Section titled “What it is”A system’s cybersecurity supply chain risk management plan, following the sample outline in NIST SP 800-161 Rev. 1 Appendix D.3.1 and the outline example NIST publishes with SP 800-18 Rev. 2, with the system’s critical components, services and suppliers, the supply chain controls selected, the risks accepted, and the plan’s approval, review and protection, as SP 800-53 SR-2 requires.
Controls satisfied
Section titled “Controls satisfied”| Control | Title |
|---|---|
| SR-2 | Supply Chain Risk Management Plan |
| SR-2(1) | Establish SCRM Team |
| SR-3 | Supply Chain Controls and Processes |
Downloads
Section titled “Downloads”| Variant | Ready to adopt | Annotated |
|---|---|---|
| All baselines | Word · Markdown | Word · Markdown |
Preview (annotated)
Section titled “Preview (annotated)”| System name | System identifier | Plan version | Plan owner | Approval date |
|---|---|---|---|---|
| Fill in: system name | Fill in: unique system identifier | Fill in: version | System owner | Fill in: date |
This plan contains information about the system’s suppliers, critical components and known supply chain weaknesses. Handle it at least as carefully as the system security plan, and share it only with those who need it (SR-2c).
Plan approval
Section titled “Plan approval”This plan was reviewed and is approved by the authorizing official, after coordination with the supply chain risk management team and the procurement office (SR-2a).
| Name | Role | Signature | Date |
|---|---|---|---|
| Fill in: name | System owner (plan owner) | Fill in: date | |
| Fill in: name | Lead of the supply chain risk management team (coordination) | Fill in: date | |
| Fill in: name | Authorizing official (approval) | Fill in: date |
1. System name and identifier
Section titled “1. System name and identifier”This plan covers Fill in: system name (Fill in: unique system identifier), Fill in: previous names of the system, or “no previous names”. It describes the supply chain controls in place or planned for the system, and applies these organization-level documents to it:
- The organization’s supply chain risk management strategy (PM-30): Fill in: title, version and location
- The Supply Chain Risk Management Policy (SR-1): Fill in: version and location
- The system’s system security plan: Fill in: version and location
2. System description
Section titled “2. System description”2.1 Purpose and scope
Section titled “2.1 Purpose and scope”Fill in: the function and purpose of the system, the mission or business functions it supports, and the information it processes, or a reference to sections 2 and 6 of the system security plan
This plan applies to Fill in: systems, system components, or system services for which a supply chain risk management plan is developed Typical: each system, including the components and services the criticality analysis (RA-9) identifies as critical and the external services the system depends on (SR-2a). It covers supply chain risk in the research and development, design, manufacturing, acquisition, delivery, integration, operations and maintenance, and disposal of the system and its components and services (SR-2a).
Environment of operation: Fill in: for example on-premises data center, a named cloud service, operational technology at a site, or a mix. Technologies or factors that bring additional supply chain risk: Fill in: for example operational technology, custom hardware, open-source dependencies, offshore development, a single-source component, or “none identified”.
2.2 Approach to supply chain risk
Section titled “2.2 Approach to supply chain risk”| Element (SR-2a) | For this system |
|---|---|
| Supply chain risk tolerance | Fill in: the tolerance the system applies from the supply chain risk management strategy, for example no unassessed supplier for a critical component, and no component from an excluded source |
| Acceptable mitigation strategies and controls | Section 7 |
| Process for evaluating and monitoring supply chain risk | Section 7.2, with supplier assessments on the supplier assessment questionnaire (SR-6) |
| How the plan is implemented and communicated | Fill in: for example the plan is stored in the authorization package, its controls are carried into contracts by the procurement office, and the system team is briefed after each approved change |
| Description of and justification for mitigation measures | Sections 7.3 and 7.4 |
| Roles and responsibilities | Section 8 |
3. Information types and security categorization
Section titled “3. Information types and security categorization”The information types, impact levels and overall categorization are recorded in Fill in: the security categorization worksheet or section 6 of the system security plan (RA-2). In brief:
| Security objective | Impact level |
|---|---|
| Confidentiality | Fill in: low, moderate or high |
| Integrity | Fill in: low, moderate or high |
| Availability | Fill in: low, moderate or high |
| Overall security categorization | Fill in: low, moderate or high |
4. System operational status
Section titled “4. System operational status”Fill in: one or more of: under development (being designed or developed, not yet fully operating); operational (authorized and operating); undergoing a significant modification; disposal (no longer authorized or operating). If more than one applies, say which part of the system has which status
5. Diagrams, inventory and life cycle activities
Section titled “5. Diagrams, inventory and life cycle activities”5.1 Diagrams
Section titled “5.1 Diagrams”The authorization boundary, network and data flow diagrams are Fill in: location, for example the system security plan section 7 and its attachments.
5.2 Component inventory
Section titled “5.2 Component inventory”The authoritative component inventory is the system’s component inventory (CM-8), kept in Fill in: the tool or location. For supply chain purposes it records, for hardware, each component’s manufacturer and model, serial number and asset tag, firmware version, operating system and end of support, warranty or maintenance contract and location; and for software, each product’s version, developer or source, vendor, license, support status and, where the supplier provides one, its software bill of materials.
Summary: Fill in: types and counts of components, and how the inventory is kept current with component versions, configurations and suppliers.
5.3 Critical components and services
Section titled “5.3 Critical components and services”The components and services the criticality analysis (RA-9) identifies as critical to the system:
| Component or service | Function it performs for the system | Why it is critical | Supplier (section 5.4) | Origin, where known | Supply chain controls applied (section 7) |
|---|---|---|---|---|---|
| Fill in: name and version | Fill in: function | Fill in: for example it performs a security function, has privileged access, or its failure stops a mission-critical function | Fill in: supplier | Fill in: manufacturer and country of manufacture or development | Fill in: for example supplier assessment, notification terms, inspection before use and annually, signed updates only |
- The System owner shall keep this list consistent with the criticality analysis (RA-9) and the component inventory (CM-8), and update it within Fill in: time, for example 30 days of a change to either. (SR-2a)
5.4 Supplier inventory
Section titled “5.4 Supplier inventory”| Supplier | Products or services it provides to the system | Criticality | Contract or agreement | Last supplier assessment (ID and date) | Next assessment due | Notification contact (SR-8) |
|---|---|---|---|---|---|---|
| Fill in: supplier name | Fill in: products or services | Fill in: critical, or not critical | Fill in: contract number and end date | Fill in: assessment ID and date, from the supplier assessment register | Fill in: date | Fill in: name or mailbox |
5.5 Life cycle activities
Section titled “5.5 Life cycle activities”| Life cycle phase | Supply chain activities and controls for this system | Who |
|---|---|---|
| Research and development, and design | Fill in: for example criticality analysis of the design, supply chain requirements in the architecture, choice of components with known provenance | Fill in: role |
| Manufacturing and development | Fill in: for example the developer’s secure development practices (SA-15), protection of the build environment, signed releases | Fill in: role |
| Acquisition | Fill in: for example supply chain terms in the solicitation and contract (SA-4, SR-5), supplier assessment before award (SR-6) | Procurement office, supply chain risk management team |
| Delivery | Fill in: for example tamper-evident packaging, tracked delivery, inspection on receipt (PE-16, SR-10), authenticity checks (SR-11) | Fill in: role |
| Integration | Fill in: for example configuration to baseline before connection (CM-6), verification of software signatures | Fill in: role |
| Operations and maintenance | Fill in: for example supplier notifications (SR-8), periodic inspection (SR-10), controlled repair (MA-2, SR-11(2)), supplier reassessment | Fill in: role |
| Disposal | Fill in: for example sanitization and certified destruction (MP-6, SR-12) | Fill in: role |
6. Information exchanges and system connections
Section titled “6. Information exchanges and system connections”The system’s information exchanges, their agreements and the other systems’ authorization status are recorded in Fill in: section 8 of the system security plan, and the information exchange agreements (CA-3). Supply chain findings that affect an exchange, from supplier assessments, supply chain risk assessments or continuous monitoring, are:
| Exchange or connection | Agreement and dates | Supply chain finding | Mitigation |
|---|---|---|---|
| Fill in: other system or service | Fill in: agreement type and end date | Fill in: finding, or “none” | Fill in: mitigation, or “not applicable” |
7. Supply chain control details
Section titled “7. Supply chain control details”7.1 Control selection
Section titled “7.1 Control selection”The system uses the Fill in: Low, Moderate or High control baseline, with the supply chain risk management controls of the Supply Chain Risk Management Policy and Fill in: any supply chain overlay or added controls, for example from SP 800-161 Rev. 1 Appendix A, or “no additions”. Tailoring decisions and their reasons: Fill in: controls added or changed for supply chain reasons, and why.
7.2 Identifying and addressing supply chain weaknesses
Section titled “7.2 Identifying and addressing supply chain weaknesses”- The System owner shall identify and address weaknesses or deficiencies in the supply chain elements and processes of Fill in: the system or system component requiring a process or processes to identify and address weaknesses or deficiencies Typical: each system and the components and services the criticality analysis (RA-9) identifies as critical in coordination with Fill in: supply chain personnel with whom to coordinate the process or processes to identify and address weaknesses or deficiencies in the supply chain elements and processes Typical: the supply chain risk management team (SR-2(1)), the procurement office, and the designated supply chain contacts of the suppliers and contractors involved. (SR-3a)
- The process draws on supplier assessments, supplier notifications, inspection results, security advisories, incidents, and changes in a supplier’s ownership, location or sources; each weakness found is recorded in the risk register or the plan of action and milestones, with an owner, a response and a due date.
- The supply chain risk assessment for the system (RA-3(1)) is Fill in: location and date, and its results inform the controls in section 7.3.
7.3 Control implementation
Section titled “7.3 Control implementation”The system employs Fill in: supply chain controls employed to protect against supply chain risks to the system, system component, or system service and to limit the harm or consequences from supply chain-related events Typical: the controls the supply chain risk management plan selects, including at least the supply chain terms of the acquisition security requirements standard (SA-4, SR-5), supplier assessments (SR-6), notification agreements (SR-8), inspection of components on receipt and after repair (SR-10), anti-counterfeit measures (SR-11) and controlled disposal (SR-12), and this plan is where those processes and controls are documented for the system (SR-3b, SR-3c).
| Control | How it is implemented for this system | Responsibility | Implementation status | Assessment status |
|---|---|---|---|---|
| SR-2(1) Supply chain risk management team | Fill in: for example the organization’s team, under its charter; this system’s representative is named in section 8 | Fill in: common, system-specific or hybrid | Fill in: planned, partially implemented or fully implemented | Fill in: satisfied or other than satisfied, with the date and report |
| SR-3 Supply chain controls and processes | Section 7.2, and this table | Fill in: responsibility | Fill in: status | Fill in: assessment status |
| SR-5 Acquisition strategies, tools and methods | Fill in: for example the supply chain terms of the acquisition security requirements standard in every contract in section 5.4, and review by the supply chain risk management team before award of a critical component or service | Fill in: responsibility | Fill in: status | Fill in: assessment status |
| SR-6 Supplier assessments and reviews (Moderate and High) | Fill in: for example each supplier in section 5.4 assessed on the supplier assessment questionnaire before award or renewal, and critical suppliers each year | Fill in: responsibility | Fill in: status | Fill in: assessment status |
| SR-8 Notification agreements | Fill in: for example compromise notification and assessment-result terms in each critical supplier’s contract, with contacts in section 5.4 | Fill in: responsibility | Fill in: status | Fill in: assessment status |
| SR-9 and SR-9(1) Tamper resistance and detection (High) | Fill in: for example tamper-evident seals and firmware integrity checks on the critical hardware in section 5.3, or “not applicable: not a High system” | Fill in: responsibility | Fill in: status | Fill in: assessment status |
| SR-10 Inspection of systems or components | Fill in: which components are inspected, when, and where results are recorded | Fill in: responsibility | Fill in: status | Fill in: assessment status |
| SR-11, SR-11(1) and SR-11(2) Component authenticity | Fill in: for example purchase from authorized sources only, signature or hash checks on software, anti-counterfeit training for the staff who receive and repair components, configuration control during repair | Fill in: responsibility | Fill in: status | Fill in: assessment status |
| SR-12 Component disposal | Fill in: for example sanitization under MP-6 and certified destruction by the contracted provider, recorded in the media sanitization record | Fill in: responsibility | Fill in: status | Fill in: assessment status |
| Related controls in other families: SA-4, SA-9, MA-2, PE-16, CM-8, RA-3(1), RA-9 | Fill in: how each supports supply chain risk management for this system, or a reference to its implementation in the system security plan | Fill in: responsibility | Fill in: status | Fill in: assessment status |
7.4 Supply chain risks and their responses
Section titled “7.4 Supply chain risks and their responses”| Risk | Source (assessment, notification, inspection or other) | Rating | Response (accept, mitigate, transfer or avoid) | Justification for the measures taken | Tracked in |
|---|---|---|---|---|---|
| Fill in: risk | Fill in: source and date | Fill in: rating, on the organization’s scale | Fill in: response and the measures | Fill in: why these measures are enough, given the risk tolerance in section 2.2 | Fill in: risk register or POA&M item |
- A supply chain risk above the tolerance in section 2.2 shall be mitigated, avoided or transferred, or accepted by the authorizing official, and the decision shall be recorded in this table. (SR-2a)
8. Roles
Section titled “8. Roles”| Role | Name | Organizational unit | Business phone | Business email | Responsibilities under this plan |
|---|---|---|---|---|---|
| Authorizing official, and designated representative | Fill in: names | Fill in: unit | Fill in: phone | Fill in: email | Approves this plan and its significant changes; accepts supply chain risks above the tolerance |
| System owner | Fill in: name | Fill in: unit | Fill in: phone | Fill in: email | Owns, reviews and protects this plan; keeps sections 5.3 and 5.4 current |
| Supply chain risk management team representative | Fill in: name | Fill in: unit | Fill in: phone | Fill in: email | Runs supplier assessments, reviews acquisitions before award, coordinates supplier notifications (SR-2(1)) |
| Chief Information Security Officer | Fill in: name | Fill in: unit | Fill in: phone | Fill in: email | Owns the Supply Chain Risk Management Policy and the common supply chain controls |
| Procurement office or contracting officer | Fill in: name | Fill in: unit | Fill in: phone | Fill in: email | Puts the supply chain terms into each solicitation and contract |
| System security officer | Fill in: name | Fill in: unit | Fill in: phone | Fill in: email | Tracks supply chain weaknesses; checks the controls in section 7.3 |
| Common control provider | Fill in: name | Fill in: unit | Fill in: phone | Fill in: email | Provides the inherited supply chain controls |
| Information owner | Fill in: name | Fill in: unit | Fill in: phone | Fill in: email | Advises on the impact of a supplier’s access to the information |
| Legal counsel | Fill in: name | Fill in: unit | Fill in: phone | Fill in: email | Advises on contract terms, ownership concerns and exclusions |
| Fill in: supplier and vendor contacts, engineering leads and service providers | Fill in: name | Fill in: organization | Fill in: phone | Fill in: email | Fill in: role |
Use business contact information only, not personal phone numbers.
Supplier governance. Fill in: how the system’s key supplier relationships are managed: who manages each, the performance and compliance measures in the contracts, how often they are reviewed, and how problems are escalated
9. Contingencies and emergencies
Section titled “9. Contingencies and emergencies”When a component or service is needed urgently for mission continuity and the normal supply chain review cannot be completed in time, Fill in: the role that may approve an exception, for example the chief information officer may approve an abbreviated procedure. During an emergency, advice is available from:
| Subject | Contact | Business phone | Business email |
|---|---|---|---|
| Supply chain risk management | Fill in: name | Fill in: phone | Fill in: email |
| Acquisition | Fill in: name | Fill in: phone | Fill in: email |
| Legal | Fill in: name | Fill in: phone | Fill in: email |
- Even under the abbreviated procedure, components shall be bought from the original manufacturer or an authorized distributor or reseller where one can supply in time, and inspected under SR-10 before they are connected to the system. (SR-11a, SR-10)
- Each emergency acquisition shall be recorded, and its supplier assessed and the risk recorded in section 7.4 within Fill in: time, for example 30 days. (SR-6, SR-2a)
10. Related laws, regulations and policies
Section titled “10. Related laws, regulations and policies”- The Supply Chain Risk Management Policy and the supply chain risk management strategy (section 1)
- The acquisition security requirements standard, whose supply chain terms (section 4.5) go into the system’s contracts
- Fill in: other laws, regulations, contract requirements and organizational policies that set supply chain requirements for the system
Prohibited and restricted suppliers and products. Fill in: suppliers or products that law, a regulatory exclusion, or organizational or system policy prohibits or restricts for this system, and where the current list is kept
Federal systems
Section titled “Federal systems”OMB Circular A-130, Appendix I, section 4.c(4), requires agencies to develop supply chain risk management plans as described in NIST SP 800-161 to ensure the integrity, security, resilience and quality of information systems. Under the Federal Acquisition Supply Chain Security Act of 2018, 41 U.S.C. § 1326(a) and (b) makes the head of each executive agency responsible for assessing the supply chain risk posed by the acquisition and use of covered articles and for integrating supply chain risk management practices throughout the life cycle of the system, component, service or asset. 41 U.S.C. § 1323(c)(5) and (7) provide for orders that exclude sources or covered articles from executive agency procurement actions or require their removal from executive agency information systems, and require executive agencies to comply with them; 41 CFR 201-1.304 repeats the duty and sets out how an agency requests an exception. The subchapter terminates on December 31, 2033 (41 U.S.C. § 1328). Statute checked in the United States Code, 2024 edition, and regulation in the eCFR, as of October 2026.
- The System owner shall develop and maintain this plan as NIST SP 800-161 Rev. 1 describes, as OMB Circular A-130, Appendix I, section 4.c(4), requires. (SR-2a)
- The list of prohibited and restricted suppliers and products in this section shall include each exclusion and removal order issued under 41 U.S.C. § 1323(c)(5) that applies to the agency, and the System owner shall remove any covered article such an order names from the system, as 41 U.S.C. § 1323(c)(7) and 41 CFR 201-1.304 require. (SR-5)
11. Revision and maintenance
Section titled “11. Revision and maintenance”- The System owner shall review and update this plan Fill in: the frequency at which to review and update the supply chain risk management plan Typical: annually, and at each life cycle milestone or gate review and each significant contracting action, such as a new contract, a renewal or a change of supplier for a critical component or service, and whenever threat, organizational or environmental changes require it. (SR-2b)
- Changes that call for a review include a change in a critical supplier, such as an ownership change, merger or acquisition, or a geopolitical or environmental event that affects it; a review of a supplier’s foreign ownership, control or influence; an attack on or breach at a supplier that affects its ability to support the system; a new, renewed, changed or ended information exchange agreement; and a change to the organization’s supply chain risk management strategy or the inherited supply chain controls.
- Each review checks that the plan is still consistent with the organization’s supply chain risk management strategy and policy.
- The System owner shall protect this plan from unauthorized disclosure and modification by marking it, storing it in Fill in: location with restricted access where only Fill in: roles can read it and only Fill in: roles can change it, and controlling changes to it. (SR-2c)
Review log:
| Date | Reviewed by | Result and notes |
|---|---|---|
| Fill in: date | Fill in: name and title | Fill in: for example no change needed, or the changes made |
Change log:
| Version | Date | Description of change | Sections affected | Changed by | Approved by |
|---|---|---|---|---|---|
| Fill in: version | Fill in: date | Fill in: description | Fill in: sections | Fill in: name, title and organization | Fill in: name and title |
12. Acronyms and glossary
Section titled “12. Acronyms and glossary”| Term | Meaning |
|---|---|
| Critical component or service | A component or service the criticality analysis (RA-9) identifies as critical to the system’s mission or business functions |
| Supplier | An organization that provides the system with a product or service, including manufacturers, developers, vendors, integrators, service providers and their own suppliers |
| Fill in: term | Fill in: meaning |
13. Attachments
Section titled “13. Attachments”| Attachment | Location |
|---|---|
| Contracts and agreements with the suppliers in section 5.4 | Fill in: location |
| Supplier assessments, on the supplier assessment questionnaire (SR-6) | Fill in: location |
| Supply chain risk assessment (RA-3(1)) and criticality analysis (RA-9) | Fill in: location |
| Component-specific risk assessments | Fill in: location, or “none” |
| Supply chain risk management plans of contractors or suppliers | Fill in: location, or “none” |
| Fill in: other artifacts referenced in section 7.3 | Fill in: location |