Skip to content

Step 6: Monitor

Monitor keeps the authorization true after it is signed: it watches for changes, reassesses controls on a schedule, keeps the package current and tells the AO when risk moves. Done well, it replaces the three-year reauthorization scramble with ongoing authorization. Source: SP 800-37 Rev. 2, section 3.7; SP 800-137.

TaskWhat it means in practicePrimary roleOutput
M-1 System and environment changesTrack changes to the system, its environment and threats; analyze security and privacy impactSystem owner, CCPChange records, impact analyses
M-2 Ongoing assessmentsAssess controls at the frequency in the ConMon strategyControl assessorUpdated assessment results
M-3 Ongoing risk responseAct on new findings: remediate, mitigate or seek acceptanceSystem owner, CCPUpdated POA&M, remediations
M-4 Authorization updatesKeep the SSP, SAR and POA&M currentSystem owner, CCPCurrent authorization package
M-5 Security and privacy reportingReport posture to the AO and agency officials on the agreed scheduleSystem owner, CCPStatus reports
M-6 Ongoing authorizationAO reviews current risk and confirms the authorization still holdsAOConfirmed, changed or withdrawn authorization
M-7 System disposalRetire the system securelySystem ownerDisposal records

Every change gets a security impact analysis before it is made (CM-4). Most changes are routine and flow through configuration management; a significant change sends the affected parts back through the RMF.

Change handling flow. A proposed change gets an impact analysis. If it is significant, the affected controls are reassessed and the AO decides; if not, it is recorded through configuration management and the SSP is updated. Both paths continue into monitoring until the next change.

The impact analysis, not the size of the change, decides the path: a one-line change that adds a new external connection is significant, while a large routine patch cycle is not.

Usually significantUsually routine
New or changed interconnection or external serviceVendor patches within the approved baseline
New information types, new PII or a change in categorizationAdding or removing user accounts
Moving hosting (for example, on-premises to cloud)Configuration changes within documented settings
New operating system, platform or major architecture changeReplacing hardware with the same approved model
Changes to cryptography or identity servicesMinor software version updates with no new functions
A threat or vulnerability that changes the risk pictureScaling capacity within the same design

Your configuration management plan and the ATO terms define significant change for your system; when in doubt, ask the AODR.

Frequencies come from the system ConMon strategy (task S-5). The values below are typical, not required.

ActivityTypical frequencyControls
Authenticated vulnerability scans of all componentsWeekly to monthlyRA-5
Configuration compliance scans (STIG or benchmark)MonthlyCM-6
POA&M review and updateMonthlyCA-5
Audit log reviewDaily to weeklyAU-6
Privileged and user access reviewQuarterlyAC-2
Assess a rotating subset of controlsAnnually (about one third of controls per year)CA-2, CA-7
Contingency plan test and incident response exerciseAnnuallyCP-4, IR-3
Penetration test (where required)AnnuallyCA-8
Policy and procedure reviewAnnuallyThe -1 control in each family
SSP and inventory reviewAnnually and on significant changePL-2, CM-8

Automate what changes fast. Feed scanners, asset inventory and configuration data into dashboards; federal civilian agencies use CISA’s Continuous Diagnostics and Mitigation (CDM) program. Manual checks are for slow-changing controls.

Move to ongoing authorization deliberately. Under OMB Circular A-130, an AO can keep an authorization open-ended once continuous monitoring gives timely, reliable risk data. Agree the triggers with the AO in writing: time-based (monthly status report) and event-based (a significant change, a major incident, a high-risk finding past due).

Keep the package living. Update the SSP when the system changes, not at reauthorization. A package that is a year stale is a finding in itself.

Plan disposal early (task M-7). Retirement means sanitizing media under SP 800-88 Rev. 2 (September 2025), keeping records per the NARA schedule, closing interconnection agreements, updating systems that inherited controls from this one, retiring the PIA and SORN, removing the system from inventory and notifying the AO.

  • Significant changes made without impact analysis or AO notice.
  • POA&M dates moved repeatedly with no milestone progress.
  • Scans cover only part of the inventory.
  • ATO expired because nobody tracked the termination date.
  • Decommissioned systems still listed as active, or never sanitized.

SP 800-37 Rev. 2 section 3.7, SP 800-137, SP 800-137A, SP 800-128, SP 800-88 Rev. 2, OMB Circular A-130.

Independent guidance, not an official NIST publication. Control text is from NIST SP 800-53 Rev. 5 and SP 800-53A (public domain). Original content is licensed CC BY 4.0; program templates and the downloadable kit are dedicated to the public domain under CC0 1.0.